Abstract
The complex nature of modern equipment and systems often lead to failures and as a consequence lead to increase in machine downtime0 thus affecting production. The failures of machineries cause disruptions in production resulting in a loss of availability of the system .This further increases the cost of maintenance. TPM has been proved as a successful tool for increasing the OEE of machineries by using simple effective techniques. Initially in this study Pareto analysis was used to figure out the major contributors towards downtime losses. RCA using the Why-Why technique was done so as to explain the reasons behind equipment breakdown. This helped in developing a PM schedule for the machines. Reliability is an important parameter for any piece of equipment. In this study Weibull statistics was used to measure the reliability of the system and also explain the CDF governing the rate of failure. The fitness of the model developed using weibull distribution was further verified using the KS test which is a “distance test”. The value of the shape parameter ? helped to understand the current state of the machine and justify the use of the PM schedule developed.

 References

[1] Wakjira, MelesseWorkneh.; Singh, Ajit Pal.; ‘Total Productive Maintenance: A Case Study in Manufacturing Industry’; Global Journal of researches in Industrial engineering Volume 12 Issue 1 Version 1.0 February 2012.
[2]Gupta, Amit Kumar.; Garg, R. K.;’OEE Improvement by TPM Implementation: A Case Study’; International Journal of IT, Engineering and Applied Sciences Research (IJIEASR); Vol. 1, No. 1, October 2012.
[3]Mirzai, M.;Gholami, A.; Aminifar, F.; ‘Failure Analysis and Reliability calculation for power transformers’; Journal of Electrical Systems, 2006.
[4]Wang, Hsiao-Mei.; ‘Comparison of the Goodness-of-Fit Tests: the Pearson Chi-square and Kolmogorov-Smirnov Tests’, Metering management journal’, Volume No. 06, 2009.
[5] Bose, D.; Ghosh, G.; Mandal, K.; Sau, S.P.; Kunar, S.; ‘Measurement & evaluation of Reliability, Availability & Maintainability of a Diesel Locomotive Engine’, International Journal of Scientific and Research Publications, Volume 3, Issue 9, September 2013.
[6] Goivil, A.K.; ‘Reliability Engineering’, Tata McGraw Hill Publishing company Ltd., (1983), pg : 44-51.
[7] M, Manoj. ; Mallesh, Dr.G.; ‘Breakdown and root cause analysis of critical machine- a case study’; International Journal of Advanced Technology in Engineering and Science; Volume No.02, Issue No. 07, July 2014.
[8] Rajput, Hemant Singh, Jayaswal, Pratesh.; ‘ A Total Productive Maintenance Approach to improve Overall Equipment efficiency’; International Journal of Modern Engineering Research (IJMER); Vol. 2, Issue-6, Nov-Dec, 2012. ISSN 2249-6645.
[9] Kumar, Praveen. ; Rudramurthy, R. ‘Analysis of Breakdowns and improvement of Preventive Maintenance on 1000 ton hydraulic press’; International Journal of Emerging Technology and advanced Engineering(IJETAE); Vol. 3 ; Issue 8; August, 2013.
[10] Hedge, Harsha G.; Mahesh, N.S.;Doss, Kishan .; ‘Overall Equipment Effectiveness improvement by TPM and 5S technique in a CNC machine shop’; SASTECH; Vol. 8; Issue 2; September, 2009, ISSN 2249-5924.

Keywords
Downtime Losses, TPM, OEE, Pareto analysis, PM schedule,Weibull distribution, CDF, Distance test, K-S test.