Root Cause Analysis of the Major Equipment Breakdown Problems of the Tube Section of a FMCG Company as an Approach to Improve OEE

  IJETT-book-cover  International Journal of Engineering Trends and Technology (IJETT)          
  
© 2015 by IJETT Journal
Volume-27 Number-4
Year of Publication : 2015
Authors : Papari Das, Thuleswar Nath
DOI :  10.14445/22315381/IJETT-V27P239

Citation 

Papari Das, Thuleswar Nath"Root Cause Analysis of the Major Equipment Breakdown Problems of the Tube Section of a FMCG Company as an Approach to Improve OEE", International Journal of Engineering Trends and Technology (IJETT), V27(4),207-213 September 2015. ISSN:2231-5381. www.ijettjournal.org. published by seventh sense research group

Abstract
Today’s manufacturing scenario faces a great deal of competition since customers are becoming more and more quality centred and demands among customers are ever increasing. As such to meet the demands of different customers, the manufacturing industries must work with efficiency to become more and more productive. One of the most important ways to increase productivity is to increase the OEE (Overall Equipment Effectiveness) of the machines or equipment. OEE can be improved with the continuous implementation of TPM (Total Productive maintenance). The aim of this study is to focus on the most significant equipment breakdowns of the tube section of a FMCG (Fast Moving Consumer Goods) company and to suggest counter measures to reduce these breakdowns, which would as a result improve the OEE. For the analysis purpose, lean tool Root cause analysis have been used and necessary recommendations made to reduce the most significant equipment breakdowns. This research reveals the tremendous importance of Autonomous Maintenance and Education & Training pillars of TPM.

 References

[1] Kiran M, Cijo Mathew, Jacob Kuriakose, ?Root cause analysis for reducing breakdowns in a manufacturing industry, International Journal of Emerging Technology and Advanced Engineering, Volume 3, Issue 1, January 2013.
[2] Ranteshwar Singh, Ashish M Gohil, Dhaval B Shah, Sanjay Desai, ?Total Productive Maintenance (TPM) Implementation in a Machine Shop: A Case Study, Procedia Engineering 51 (2013) 592-599.
[3] S.R.Vijayakumar, S.Gajendran, ?IMPROVEMENT OF OVERALL EQUIPMENT EFFECTIVENESS (OEE) IN INJECTION MOULDING PROCESS INDUSTRY, IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE), e- ISSN: 2278-1684, p-ISSN : 2320–334X, PP 47-60
[4] Amit Kumar Gupta, Dr. R. K. Garg, ?OEE Improvement by TPM Implementation: A Case Study, International Journal of IT, Engineering and Applied Sciences Research (IJIEASR), Volume 1, No. 1, October 2012.
[5] Chowdury M. L. Rahman, M. A. Hoque, Syed Misbah Uddin, ?Assessment of Total Productive Maintenance Implementation through Downtime and Mean Downtime Analysis (Case study: a Semi-automated Manufacturing Company of Bangladesh), IOSR Journal of Engineering (IOSRJEN), Vol. 04, Issue 09 (September. 2014), ? ? V4? ? PP 38-47.
[6] Prof Pradeep Kumar, Dr. K.V.M. Varambally, Dr. Lewlyn L.R. Rodrigues, ?A Methodology for Implementing Total Productive Maintenance in Manufacturing Industries–A Case Study, International Journal of Engineering Research and Development, Volume 5, Issue 2 (December 2012), PP. 32-39.
[7] Osama Taisir R.Almeanazel, ?Total Productive Maintenance Review and Overall Equipment Effectiveness Measurement, Jordan Journal of Mechanical and Industrial Engineering, Volume 4, Number 4, September 2010, ISSN 1995-6665, Pages 517 – 522.
[8] Disha M Nayak, Vijaya Kumar M N, G.Sreenivasulu Naidu, Veena Shankar, ?Evaluation Of Oee In A Continuous Process Industry On An Insulation Line In A Cable Manufacturing Unit, International Journal of Innovative Research in Science, Engineering and Technology, Vol. 2, Issue 5, May 2013.
[9] Hemant Singh Rajput, Pratesh Jayaswal, ?A Total Productive Maintenance (TPM) ApproachTo Improve Overall Equipment Efficiency, International Journal of Modern Engineering Research (IJMER), Vol.2, Issue.6, Nov- Dec. 2012 pp-4383-4386.
[10] Sarang G. Katkamwar, Sadashiv K. Wadatkar, Ravikant V. Paropate, ?Study of Total Productive Maintenance & Its Implementing Approach in Spinning Industries, International Journal of Engineering Trends and Technology (IJETT) - Volume4Issue5- May 2013
[11] Prof. A.Bangar, Hemlata Sahu, Jagmohan Batham, ?Improving Overall Equipment Effectiveness by Implementing Total Productive Maintenance in Auto Industry, International Journal of Emerging Technology and Advanced Engineering, Volume 3, Issue 6, June 2013.
[12] Ponce-Hernández M.M., González-Angeles A, Navarro- González C.R. and Cabrera-Córdova E., ?Overall Equipment Effectiveness (OEE) Diagnosis and Improving in a Small Business as an Essential tool for Business Competitiveness, Research Journal of Recent Sciences, Vol. 2(6), 58-65, June (2013).

Keywords
TPM, OEE, Equipment Breakdown, Pareto Analysis, Fishbone Analysis, Root Cause Analysis.