Development of a Scheduling Heuristic for the Fabrication Shop of a Sheet Metal Processing Industry
Citation
Ranbir Kalita, Ajoy Krishna Dutta, P. B. Barua"Development of a Scheduling Heuristic for the Fabrication Shop of a Sheet Metal Processing Industry", International Journal of Engineering Trends and Technology (IJETT), V29(2),87-90 November 2015. ISSN:2231-5381. www.ijettjournal.org. published by seventh sense research group
Abstract
Machine idle time is one of the main
causes for lower machine utilization and prevents the
use of its full potential and capacity. As a result, the
value of average flow time and makespan increases
and becomes a reason for production and delivery
delays. Since the last few decades, a number of
scheduling and sequencing techniques have been
developed by many researchers to minimize these
causes. Among them, most techniques are concerned
with decreasing average flow time and makespan
value. In this paper also, a new heuristic technique is
developed for decreasing such causes. The results are
compared with that obtained by using some standard
dispatching rules and found that the developed
heuristic algorithm is performing better in minimizing
the values of makespan, average flow time and
number of machine set ups required.
References
[1] “Operations Research” (6th Revised Edition, 2012), Prem
Kumar Gupta, Dr. D.S. Hira, pp. 412 – 441, S. Chand
Publication, ISBN 81-219-0281-9, Code: 10B 087.
[2] P. B. Barua, P. C. Pandey and C. K. Singh (1986) “Machine
Loading and Product Mix in Group Technology Based
Manufacturing Systems”, Proceeding of the 12th All India
Machine Tool design and Research Conference, pp. 474 –
477, held at IIT, Delhi, 10 – 12 December, 1986.
[3] K. Luchoomun, P. Auckloo, B. Sonah (July 2014)
“Enhancing Performance of Genetic Algorithm for Static
Job-Shop Scheduling Problems”, International Refereed
Journal of Engineering and Science (IRJES), Vol. 3, Issue 7,
pp. 39-49, ISSN (Online) 2319-183X, (Print) 2319-1821.
[4] Vincent Lal, C. Anand Deva Durai (February 2014) “A
Survey on Various Optimization Techniques with Respect to
Flexible Job Shop Scheduling”, International Journal of
Scientific and Research Publications, Vo. 4, Issue 2, pp. 1-7,
ISSN 2250-3153.
[5] Nakandhrakumar, R. S., Seralathan, S., Azarudeen, A.,
Narendran, V., “Optimization of Job Shop Scheduling
Problem using Tabu Search Optimization Technique”, 2014
International Conference on Innovations in Engineering and
Technology (ICIET’14) on 21st & 22nd March, 2014,
Organized by K.L.N. College of Engineering and
Technology, Madurai, Tamil Nadu, India, Vo. 3, Special
issue 3, pp. 1241-1244, ISSN (Online) : 2319 – 8753 and
ISSN (Print) : 2347 – 6710.
[6] Kaban, A. K.; Othman, Z. and Rohmah, D. S. (2012),
“Comparison on Dispatching Rules in Hob-Shop Scheduling
Problem using simulation: A Case Study”, DOI:
10.2507/IJMIMM11(3)2.201, pp. 129-140, ISSN: 1726-4529.
Keywords
Machine idle time, average flow time,
makespan, sequencing and scheduling, dispatching
rule, heuristics.