Methodology for Ranking of Factors Affecting Selection of Subcontractor for Construction Contractors of Gujarat

  IJETT-book-cover  International Journal of Engineering Trends and Technology (IJETT)          
  
© 2016 by IJETT Journal
Volume-32 Number-1
Year of Publication : 2016
Authors : Desaria Taruna, Dr.Rajiv Bhatt, Prof.Jaydev.J.Bhavsar
DOI :  10.14445/22315381/IJETT-V32P204

Citation 

Desaria Taruna, Dr.Rajiv Bhatt, Prof.Jaydev.J.Bhavsar"Methodology for Ranking of Factors Affecting Selection of Subcontractor for Construction Contractors of Gujarat", International Journal of Engineering Trends and Technology (IJETT), V32(1),19-25 February 2016. ISSN:2231-5381. www.ijettjournal.org. published by seventh sense research group

Abstract
Subcontractors play a vital role in the construction industry. Subcontractors are specialty contractors who are hired to perform specific tasks on a project. On many projects, it is common for 80- 90% of the work to be performed by subcontractors. Selection of the best sub-contractor is a vital process in construction industry. There are many factors which affecting selection of subcontractors for construction contractors of Gujarat. Improper selection of sub-contractors might lead to many problems during work progress. Mainly, existing models of subcontractor selection evaluate subcontractor based on a set of subjective factors that are deemed important by the decision maker. Such subjective factors include performance on previous projects, financial strength, completion on time, safety record, timely payment to labour and suppliers.

 References

[1] Bose, A.J.C., “Subcontracting, Industrialization and Labour Conditions in India: An Appraisal”, The Indian Journal of Labour Economics, Vol. 39, No. 1, 1996.
[2] Bresnen, M. and Marshall, N. (2000a) Building Partnerships: Case Studies of Client-Contractor Collaboration in the UK Construction Industry, Construction Management and Economics 18(7): 819-832.
[3] Cheng, E. W. L. and Li, H. (2004) „Contractor Selection Using the Analytic Network Process?: Construction Management and Economics. 22.(10) pp.1021-1032.
[4] Cheung, S., Lam, T., Leung, M. and Wan, Y. (2001) „An Analytical Hierarchy Process Based Procurement Selection Method?: Construction Management and Economics. 19.(4) pp.427-437.
[5] Clarke, A.E. 1994. “Spatial Linkages and Subcontracting Relationships among High technology Industries in the Northeast Ohio Region”, Environment and Planning A, 26(10), 1579-1603.
[6] Construction Industry Board (CIB), 1997 Code of practice for the selection of subcontractors.
[7] David Kelly,Examination of Design-Assist Subcontracting, (February 12, 2014) Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, © ASCE, ISSN 1943-4162/04514001(7)/$25.00.
[8] Eom, C. S. J., Yun, S. H., and Paek, J. H. (2008). “Subcontractor evaluation and management framework for strategic partnering.” J. Constr. Eng. Manage., 134(11), 842.
[9] Favié, Ruben (2007) Criteria for selection of contractors,in Dutch.
[10] Gul Polat, Subcontractor selection using genetic algorithms (June 2015), Creative Construction Conference, Poland. [Project number: 114M130].
[11] H. Randolph Thomas (AUGUST 2011) Fundamental Principles of Subcontractor Management, American Society of Civil Engineers, DOI: 10.1061/(ASCE)SC.1943-5576.0000087
[12] Hartmann, A., Caerteling, J. (2010). Subcontractor procurement in construction: the interplay of price and trust. Supply Chain Management: An International Journal, 15(5), 354-362.
[13] Hartmann, A., F.Y.Y. Ling and J.S. Tan, (2009). Relative importance of subcontractor selection criteria: evidence from Singapore. Journal of Construction Engineering and Management, 135(9): 826-832.
[14] Hatush, Z., and Skitmore, M. (1997). “Criteria for contractor selection.” Constr. Manage. Econom., 151, 19– 38.
[15] Hinze, M. (1994). "Subcontracting Practice in the Turkish Textile and Metal-working Industries", in F. Senses (ed.), Recent Industrialization Experience of Turkey in a Global Context, Westport: Greenwood Press, pp.141-154.
[16] Khalfan, M. M. A.; McDermott, P. and Asad, S. (2005) Supply chain integration within construction: related theories and concepts, 2nd SCRI Symposium in Salford, 12 – 13 April 2005, pp. 191 - 200.
[17] Khalfan, M; Erickson, P; and Dickson, P; (2006) Listen to the voice of Suppliers and Subcontractors, International Journal of Quality & eliability Management,17(4/5) pp. 509 – 520.
[18] Latham, M. (1994) Constructing the Team: Joint Review of Procurement and Contractual Arrangements in the UK Construction Industry: Final Report/ by Sir Michael Latham. London: H.M.S.O.
[19] Lavelle, D, Hendry, J and Steel, G (2007) The selection of subcontractors: is price the major factor? In: Boyd, D (Ed) Procs 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK, Association of Researchers in Construction Management, 65-73.
[20] Lew Yoke-Lian, (August 2012) Review of Subcontracting Practice in Construction Industry, IACSIT International Journal of Engineering and Technology, Vol. 4, No. 4.
[21] Miyazawa, Kenichi (1980) `The Dual Structure of the Japanese Economy and its Growth Pattern` in Sato (Ed) "Industry and Business in Japan" M E Sharp and Co, New York.
[22] Mohamed M. Marzouk, (February 2013), Factors influencing sub-contractors selection in construction projects, Housing and Building National Research Center.
[23] Mohammad S. El-Mashaleh,(2009) A Construction Subcontractor Selection Model, Jordan Journal of Civil Engineering, Volume 3, No. 4
[24] Moore, M.J., 1985, Selecting a contractor for fast-track projects, Pt II, Quantitative Evaluation Method, Plant Engineering, 39(18), 54-6.
[25] Nagaraj,R. (Aug., 1984), `Economic and Political Weekly, Vol. 19, No. 31/33, Annual Number: Focus on Industry (Aug., 1984), pp. 1435-1453.
[26] Nur „Izzati Hidzir , A Theory of Subcontractor Bullying in Construction Industry (April 2015), ISSN-1995-0756 EISSN-1998-1066 Journal home page :56-59
[27] Ohnuma, D. K., Pereira, S. R., and Cardoso, F. F. (2000, April 24 – 27). The Role of the Subcontractors in the Competitiveness of Building Companies and the Integration of Value Chains Symposium conducted at the meeting of the Proceedings of the CIB W92 Procurement System Symposium, Santiago, Chile.
[28] Oluwaseyi Modupe Ajayi, (july 2010)Criteria for selection of subcontractors and suppliers in a building project in Lagos state, Nigeria ISBN: 978-0-620-46703-2.
[29] S. Cheung, T. Lam, M. Leung, Y. Wan, An analytic hierarchy process based procurement selection method, Constr. Manage. Econ. 19 (4) (2001) 427–437.
[30] S. Maturana, L. F. Alarcón, P. Gazmuri, and M. Vrsalovic, “On-site subcontractor evaluation method based on learn principles and partnering practices,” Journal of Management in Engineering, vol. 23, p. 67, 2007.
[31] S. Patil, Prof. Mrs. P. R. Adavi / International Journal of Engineering Research and Applications (IJERA) ISSN: 2248-9622 www.ijera.com Vol. 2, Issue 5, September- October 2012, pp.1806-1809
[32] S.Thomas Ng,(2003)Ten Basic Factors To Identify Suitble Subcontractors for Construction Projects ,CIB TG Internation Conference ,Hong Kong.
[33] Sambasivan, M. and Y.W. Soon, 2007. Causes and effects of delays in Malaysian construction industry. International Journal of project management, 25(5): 517-526.
[34] Severson, G.D., Jaselskis, E.J., Russell, J.S., 1994, Trends in construction contractor financial data, J of Const Engrg and Mangt, 119(4) ??pages??
[35] Steve Warnick,(2000) MANAGING CONTRACTOR DEFAULT RISK PREQUALIFYING CONTRACTORS AND SUBCONTRACTORS, International Risk Management Institute, Inc.
[36] Talukhaba,A.A.and Mapatha,M.(2007).Selection framework for domestic subcontractors by contractors in the construction industry.CIB world building congress,768- 781.
[37] Thomas, H. R., and Ellis, R. D. (2007a). “Contractor pre bid planning principles.” J. Constr. Eng. Manage., 133(8), 542–552.
[38] Van Weele, A J (2005) Purchasing and supply chain management: analysis, strategy, planning and practice. London: Thomson.
[39] Vilasini, N., Neitzert, T. R., Rotimi, J. O. B., and Windapo, A. O. (2012). A framework for subcontractor integration in alliance contracts. International Journal of Construction Supply Chain Management. 2(1), 17-33

Keywords
Subcontractor, Selection criteria.