Applied Procedures for Lead Time Reduction: A Review

  IJETT-book-cover  International Journal of Engineering Trends and Technology (IJETT)          
  
© 2017 by IJETT Journal
Volume-43 Number-3
Year of Publication : 2017
Authors : Raagul Srinivasan K A, JawagarShrehari J
DOI :  10.14445/22315381/IJETT-V43P228

Citation 

Raagul Srinivasan K A, JawagarShrehari J "Applied Procedures for Lead Time Reduction: A Review", International Journal of Engineering Trends and Technology (IJETT), V43(3),169-172 January 2017. ISSN:2231-5381. www.ijettjournal.org. published by seventh sense research group

Abstract
A Lead time is the latency between the initiation and execution of a process. In terms of Supply Chain Management lead time can also be defined as the time from the moment the customer places an order to moment it is ready for delivery. In manufacturing sector lead time includes the time required to ship the parts to the supplier. In project management lead time is the time it takes to complete a task or a set of interdependent tasks. In this paper, we interpret the causes for excess lead time and suggest practical, inexpensive strategies and procedures for reducing it. Our recommendations are based on detailed study of many manufacturing industries. Interpreting the differences between work in process, flow time variance and lead time, we systematically review potential methods for lead time reduction by reducing lead time or flow time variance.

 References

[1]Nikos I. Karacapilidisa , Costas P. Pappis b “Production planning and control in textile industry: A case study” journal of Computer aided manufacturing management Vol :30 (1996) 127-144.
[2] Laden, L.J., Das, D., Cartwright, J.L., Yenkner, R. and Razmi,J. ‘Implementation of Six Sigma quality system in Celestica withpractical Examples’, Int. J. Six Sigma and Competitive Advantage,Vol. 2, No. 1(1998), pp.69–88.
[3] ChakravortyMukunt, S. Satya and Arun .R. ‘Six Sigma programs: An Implementation Model. International journal ofProduction Economics 119 (2009) 1-16.
[4] Ajit Kumar Sahoo& Singh.N.K & Ravi Shankar & Tiwari.M.K(2008), “Lean philosophy: implementation in aforging company”, International journal on advance ManufacturingTechnology, vol 36–(2008),:451-462.
[5] Jan Riezebos, WarseKlingenberg, and Christian Hicks “LeanProduction and information technology: Connection orcontradiction?” Computers in Industry 60 (2009) 237–247.
[6] Richard J. Schonberg, “Japanese production management: An evolution—with mixed success” Journal of Operations Management25 (2007) 403–419.
[7] R.M. Belokar and Vikas Kumar, " An Application of Value Stream Mapping In Automotive Industry: A Case Study," International Journal of Innovative Technology and Exploring Engineering, 2012.
[8] D. Rajenthirakumar& S.G. Harikarthik, "Process Cycle Efficiency Improvement through Lean: ACase Study," International Journal of Lean Thinking, 2011.
[9] Meng B, D. Mingyao, Research on the Lean Process Reengineering Based on Value Stream Mapping.Management Science and Engineering, Vol. 6, No. 2, 2012, pp. 103-106, 2012.
[10] D. Rajenthirakumar,P.R. Thyla, Transformation to Lean Manufacturing By an AutomotiveComponent Manufacturing Company.International Journal of Lean Thinking Volume 2, Issue 2,2011.
[11] D. Rajenthirakumar, P. R. Thyla& John Paul Ajay, Implementation of Lean Assembly Line: A CaseStudy, International Journal of Engineering, tome VIII, Fascicule 3, 2010.
[12] Singh, B., and Sharma, S. K. , “Value stream mapping as a versatile tool for lean implementation: an Indian case study of a manufacturing firm”, Measuring Business Excellence, Vol. 13, No. 3, pp. 58-68,2009.

Keywords
Lead Time, Value Stream Method, TAKT Timing, First In First Out.