Abstract
Sustainability in mining depends upon right project design and timely execution. Because of unforeseen geo-technical problems, some project activities have to be prioritized, requiring more attention of project officials by monthly scheduling and monitoring. Coal Project Responsibility Scheduling Model ‘mbo’ was developed for responsibility monitoring on monthly basis. Analysis was done by Key Result Areas (KRA), Strength, Weakness, Opportunity and Threat or SWOT Analysis, Managerial Effectiveness. IPR found important between superior, subordinate and colleagues for teamwork in projecting position-wise responsibility. Objective Setting by Action Plan, Responsibility Charting by Decision Chart by Confidence Factor CF. With experience as General Manager in a large mining company, computerized model program ‘mbo’ on key tasks for different management positions has been designed on key tasks for different management positions. Sample run (mbo.bat) for a particular project for a particular month shown.

 References

[1] Anderson D & Verna A, Project Management is a Capital Investment Process; Journal of Management & Engineers, Oct 2005, Vol.24, No.4, ISS0742-597X, 2005.
[2] Arora, Rajesh, Techno-Commercial Evaluation of Coal Mining Project; 3rd Asian Mining Congress, 22 - 25 January 2010, Kolkata, India, The Mining, Geological and Metallurgical Institute of India (MGMI), 2010.
[3] Dinsmore Paul C. and Cabanis-Brewin Jeannette,AMA Handbook of Project Management; American Management Association, USA, 2009.
[4] Dutta, A, Geo-environmental Impact of Mining on Coalfields; National Seminar on Development of Indian Mineral Industry Looking Ahead- August – MMGI, Kolkata, 2003.
[5] Furman U,Improving Network Access in the Mining Sector;Aust MM Bulletin, No.1, Jan/ Feb 2007.
[6] Glasserman, P and Staum, J,Resource Allocation among Simulation Time Steps; Operation Research, Nov & Dec, USA, 2003.
[7] Guo H, Zhu K, Ding C, Li L, Intelligent Optimization for Project Scheduling of the First Mining Face in Coal Mining; Expert Systems with Applications: An International Journal, Volume 37, Issue 2- Pergamon Press, New York, 2010.
[8] Jha, N.C,Sustainable Development of Indian Coal Industry – Daunting Challenges; 4th Asian Mining Congress, 29-31 January 2012, Kolkata, India: The Mining, Geological and Metallurgical Institute of India (MGMI), 2012.
[9] Kerzner, Harold, Project Management: A Systems Approach to Planning, Scheduling, and Controlling; – Amazon.com,2009.
[10] Mitchell, Paul,Achieving Major Capital Project Effectiveness and Corporate Performance; Effective Capital Project Execution Mining and Metals, Ernst & Young, © 2011 EYGM Limited. Australia, 2011.
[11] Noort, D J and Adams, C, Effective Mining Project Management Systems; International Mine Management Conference, Melbourne, Vic, 16 - 18 October 2006.
[12] OSullivan, A,Dispersed Collaboration in Multi-firm, Multi-team, Product Development Project; Journal of Engineering and Technology Management, 20-93-116 Elsevier, Amsterdam, 2003.
[13] Panigrahi, D.C,Sustainable Mining and Environment – The Indian Context; 4th Asian Mining Congress, 29-31 January 2012, Kolkata, India: The Mining, Geological and Metallurgical Institute of India (MGMI), 2012.
[14] Samanta, B.K,Break-Even Point Monitoring of Collieries with Database Programming;Minetech Vol.17, No.5, pp.34-37, Sept-Oct.1996.
[15] Samanta, B.K,Computerized Coal Multi-project Monitoring;Minetech, Vol. 19, No.6, Nov- Dec.’98, CMPDI, Ranchi, 1998.
[16] Samanta, B.K. & Samaddar, Dr. A. B,Formulation of Coal Mining Projects by Expert System; pp202- Journal of Mines, Metals and Fuels, ISSN 0022-2755, Kolkata, June 2002.
[17] Samanta, B.K,Coalnet- A Developing Intranet; XXXVII National Convention 2002 of Computer Society of India, October 29th to 31st 2002, Bangalore, India.No.42, pp251- Tata McGraw-Hill Publishing Company Limited, New Delhi, 2002.
[18] Samanta, B.K.,IT Applications in Reorganization of Quarries; RIT 2003- National Seminar on Role of IT in the Present Scenario of Globalization, CMRI & CSI- 1-2 February, Dhanbad, 2003.
[19] Samanta, B.K, Mine Project Responsibility Scheduling; International Symposium on Advances in Mining Technology and Management; IIT, Kharagpur, Nov 30- Dec 2; 2005
[20] Samanta, B.K,Advances in Computerized Project Scheduling & Monitoring; All India Seminar on Advances in Computer and Information Technology- IE(I), Dhanbad Chapter, ISM GJ Auditorium, 11-12 March, 2006.
[21] Samanta, B.K, Emerging Computerized Project Scheduling Networks; Recent Advances on Information Technology (RAIT-2007); Proceedings of the National Seminar, Allied Publishers Pvt. Ltd-Department of Computer Science & Engineering; Indian School of Mines University, Dhanbad-826004, Feb 26-27, 2007.
[22] Samanta, B.K,Developments in Computerized Multi-Project Management for Sustainable Mining; 4th Asian Mining Congress, Sustainable Mining in Asia – Challenges and Opportunities, The Mining, Geological, & Metallurgical Institute of India (MGMI), 29-31 January, Kolkata, 2012.
[23] Samanta, B.K, Mining Multi-Project Monitoring Computer Model for Summarized Assessment; National Convention of Mining Engineering of IE(I), Kolkata in collaboration with BESU; 23-24 Feb’ 2012.
[24] Samanta, B.K, Multi Criteria Decision Model for Mining Projects; Journal of Modern Project Management, January-April 2017; pp.113, 2017.
[25] Samanta, B.K, Environment & Safety Challenges in Oil & Gas Projects; International Conference on Challenges and Prospects of Petroleum and Processing Industries, PEDJP-2017, 12-14 January; IIT(ISM), Tech Session VI-PEDJP/098, 2017.
[26] Samanta, B.K, Strategies to Achieve National Demand of Coal and Mineral Production;The Indian Mining & Engineering Journal, January 2017.
[27] Sarkar, B. N and Samanta, B.K, Mine Mechanisation with Machine Safety and System Safety; XIII World Congress on Occupational Safety and Health, New Delhi. 1993.
[28] Singh, A.K, Indian Coal Industry – Concerns of Resources and Reserves; 4th Asian Mining Congress, 29-31 January 2012, Kolkata, India: The Mining, Geological and Metallurgical Institute of India (MGMI), 2012.
[29] Sinha, Amalendu, R&D for Sustainable Mining in India- The Way Forward; 4th Asian Mining Congress, 29-31 January 2012, Kolkata, India: The Mining, Geological and Metallurgical Institute of India (MGMI), 2012.

Keywords
Key Result Areas (KRA); Strength, Weakness, Opportunity and Threat (SWOT) Analysis; Job Effectiveness Description (JED); Decision Chart; Confidence Factor (CF.