Study on Target Program of G+15 Hospitality Building Cluster

  IJETT-book-cover  International Journal of Engineering Trends and Technology (IJETT)          
  
© 2017 by IJETT Journal
Volume-44 Number-4
Year of Publication : 2017
Authors : D Pruthvi Charan Reddy, Sohail Amer
DOI :  10.14445/22315381/IJETT-V44P232

Citation 

D Pruthvi Charan Reddy, Sohail Amer "Study on Target Program of G+15 Hospitality Building Cluster", International Journal of Engineering Trends and Technology (IJETT), V44(3),157-162 February 2017. ISSN:2231-5381. www.ijettjournal.org. published by seventh sense research group

Abstract
Delay in construction projects is a common issue. Considerable percentages of projects fall behind schedule causing damages to almost all involved parties. Owners may experience losses due to postponed completion dates and Contractors may face liquidated damages. Even Architects and Engineers may face additional challenges resulted by delays. This paper is a study on a target program developed and scheduled for a cluster of five G+15 hospitality buildings. An analysis has been conducted on the Target program, Timeframe, Milestones and Work Breakdown Structure of the project. After analyzing the available project data, target program has been prepared and it is set as a base for the project to be executed. The inference of the study also tries to show the achieved progress of the planned target program. Data of project progress reports at various time intervals has been used to understand and analyze them for the purpose of the study. Key Performance Indicators (KPI) like S- curves is used for the study. The study also underlines the importance of the KPI and their significance in making timely changes in the project schedule to achieve desired project outcomes in defined time frame. Graphical and Tabular representation of the S-curves, Progress curves will give the reader a clear understanding of the objective of the paper.

 References

[1] Arshi Shakeel Faridi and Sameh Monir El-Sayegh b. "Significant factors causing delay in the UAE construction industry." Construction Management and Economics, Volume 24, Issue 11 (November 2006): pages 1167 - 1176.
[2] Adhikari I., Soo-Yong Kim and Young-Dai Lee. "Selection of Appropriate Schedule Delay Analysis Method: Analytical Hierarchy Process (AHP." Technology Management for the Global Future, (2006): Page(s):483 - 488.
[3] Jha, K. C. Iyer and K. N. Critical Factors Affecting Schedule Performance: Evidence from Indian Construction Projects. August 2006. 28 April 2009.
[4] Madhav Prasad Nepal, 1 Moonseo Park,2 and Bosik Son3. "Effects of Schedule Pressure on Construction Performance." J. Constr. Engrg. and Mgmt. Volume 132, Issue 2, (February 2006): pp. 182-188.
[5] 6) Nasa. Learning Curve calculator. 25 May 2007. 28 April 2009
[6] S. Nicoletti and F. Nicol`o. "“A concurrent engineering decision model Management of the project activities information flow,”." (n.d.).
[7] HLG Jewel of Creek 2014 Document Set No. 145

Keywords
Target Program, G+15hospitality building.