Evaluating the Selection Criteria of Formwork System (FS) for RCC Building Construction

Evaluating the Selection Criteria of Formwork System (FS) for RCC Building Construction

  IJETT-book-cover           
  
© 2023 by IJETT Journal
Volume-71 Issue-3
Year of Publication : 2023
Author : Nitin Liladhar Rane, Anand Achari, Deepak Kadam
DOI : 10.14445/22315381/IJETT-V71I3P220

How to Cite?

Nitin Liladhar Rane, Anand Achari, Deepak Kadam, "Evaluating the Selection Criteria of Formwork System (FS) for RCC Building Construction," International Journal of Engineering Trends and Technology, vol. 71, no. 3, pp. 197-205, 2023. Crossref, https://doi.org/10.14445/22315381/IJETT-V71I3P220

Abstract
Formwork System (FS) selection for reinforced cement concrete (RCC) members is a crucial factor in finishing the project successfully, as it is necessary for improved productivity and faster construction of the projects. The present study assessed the criteria influencing the formwork system selection in the construction of residential buildings. From the literature and past studies conducted on selecting the formwork system, a total of 24 influencing factors were identified. The formwork suitability is analyzed using Statistical Package for Social Sciences (SPSS). Furthermore, using the performance indicators used in the formwork system analysis, a total of 5 influencing factors were indicated as being the primary determinant of formwork selection. The remaining 19 factors were omitted because they did not have a major influence. The surface finish, capital cost, durability, labor cost, repetition, and wastage are the top 5 factors which are identified as having a significant impact on formwork system selection. This study examines the different existing formwork technology with recently invented FS, such as aluminum formwork and the jump formwork system, that are not often used in India, to determine which formwork system is most effective and appropriate for the projects under consideration. To better understand this, the hypothetical building projects employing traditional formwork were considered to compare newly developed formwork with conventional formwork systems considering the key selection criteria analyzed. The results offer a better understanding of the influencing factor affecting the formwork system selection in Mumbai City. They will help construction professionals improve productivity in terms of cost saving faster construction, expanding the existing knowledge regarding formwork selection systems, and decreasing formwork waste.

Keywords
Construction projects, Reinforced concrete formwork systems, Selection criteria, Traditional formwork, Newly emerging formwork.

References
[1] N. Iswarya et al., “Experimental Investigation on Strength and Durability of Light Weight Bacterial Concrete,” Materials Today: Proceedings, vol. 22, pp. 2808-2813, 2020. Google Scholar | CrossRef | Publisher Link
[2] G.V. Vigneshpandian et al., “Utilisation of Waste Marble Dust as Fine Aggregate in Concrete,” IOP Conference Series: Earth and Environmental Science, vol. 80, no. 1, p. 012007, 2017. Google Scholar | CrossRef | Publisher Link
[3] R. Rajendran et al., “An Experiment on Concrete Replacing Binding Material as Waste Glass Powder,” Materials Today: Proceedings, vol. 47, pp. 5447-5450, 2021. Google Scholar | CrossRef | Publisher Link
[4] R. Sanjarovsky, and M. Manchenko, “Creep of Concrete and its Instantaneous Nonlinearity of Deformation in the Structural Calculations,” Scientific Israel-Technological Advantages, vol. 17, no. 1-2, pp.180-187, 2015. Google Scholar | Publisher Link
[5] S. Suriya, and M. Madhan Kumar, “Strength Studies on FRC with Partial Replacement of Plastic Waste as Coarse Aggregate,” Materials Today: Proceedings, vol. 46, pp. 3418-3422, 2021. Google Scholar | CrossRef | Publisher Link
[6] Mohan Sai Gaddam, and Aravindan Achuthan, “A Comparative Study on Newly Emerging Type of Formwork Systems with Conventional Type of form Work Systems,” Materials Today: Proceedings, vol. 33, pp. 736-740, 2020. Google Scholar | CrossRef | Publisher Link
[7] Osama S. Hussien, “Optimum Lateral Pressure of Concrete on Formwork,” Practice Periodical on Structural Design and Construction, vol. 27, no. 2, 2022. Google Scholar | CrossRef | Publisher Link
[8] Joris Jan Burger et al., “Design and Fabrication of a Non-Standard, Structural Concrete Column Using Eggshell: Ultra-Thin, 3D Printed Formwork,” RILEM International Conference on Concrete and Digital Fabrication, Springer, Cham, pp. 1104-1115, 2020. Google Scholar | CrossRef | Publisher Link
[9] Ahmad Zakiah et al., “Fire Resistance Performance of Reinforced Concrete Column with Embedded Permanent Formwork Using Woodwool Panel,” Applied Mechanics and Materials, vol. 661, pp. 111-117, 2014. CrossRef | Publisher Link
[10] V. Rajeshkumar et al., “Analysis of Factors Influencing Formwork Material Selection in Construction Buildings,” Materials Today: Proceedings, vol. 37, pp. 880-885, 2021. Google Scholar | CrossRef | Publisher Link
[11] Emad Elbeltagi et al., “Selection of Slab Formwork System Using Fuzzy Logic,” Construction Management and Economics, vol. 29, no. 7, pp. 659-670, 2011. Google Scholar | CrossRef | Publisher Link
[12] Anna Krawczyńska-Piechna, “Application of TOPSIS Method in Formwork Selection Problem,” Applied Mechanics and Materials, vol. 797, pp. 101-107, 2015. Google Scholar | CrossRef | Publisher Link
[13] C.M.Tam et al., “Selection of Vertical Formwork System by Probabilistic Neural Networks Models,” Construction Management and Economics, vol. 23, no. 3, pp. 245-254, 2005. Google Scholar | CrossRef | Publisher Link
[14] Slawomir Biruk, and Piotr Jaskowski, “Optimization of Vertical Formwork Layout Plans Using Mixed Integer Linear Programming,” International Journal of Civil Engineering, vol. 15, no. 2, pp. 125-133, 2017. Google Scholar | CrossRef | Publisher Link
[15] H.R.Schipper, “Double-Curved Precast Concrete Elements: Research into Technical Viability of the Flexible Mould Method,” 2015. Google Scholar | Publisher Link
[16] Garold D. Oberlender, and Robert L. Peurifoy, Formwork for Concrete Structures, 4th Edition, The McGraw-Hill Companies, 2011.
[17] Chien-Ho Ko, and Jiun-De Kuo, “Making Formwork Design Lean,” Journal of Engineering Project and Production Management, vol. 9, no. 1, pp. 29-47, 2019. Google Scholar | CrossRef | Publisher Link
[18] Kinga Brózda, and Jacek Selejdak, “Safety of Formworks in the Engineering and General Construction Sector,” System Safety: Human - Technical Facility - Environment, vol. 1, no. 1, pp. 284–290, 2019. Google Scholar | CrossRef | Publisher Link
[19] Wei Li et al., “A Review of Formwork Systems for Modern Concrete Construction,” Structures, Elsevier, vol. 38, pp. 52-63, 2022. Google Scholar | CrossRef | Publisher Link
[20] Changtaek Hyun et al., “Automated Optimization of Formwork Design through Spatial Analysis in Building Information Modeling,” Automation in Construction, vol. 95, pp. 193-205, 2018. Google Scholar | CrossRef | Publisher Link
[21] Shilpa Pal, Dipti Singh, and Piyush Vidyarthi, “Shoring-Based Formwork Optimization Using SOMGA for Multi-Storey Buildings,” Proceedings of International Conference on Scientific and Natural Computing, Springer, pp. 111-125, 2021. Google Scholar | CrossRef | Publisher Link
[22] Putri Arumsari, and Christopher Xavier, “Cost and Time Analysis on the Selection of Formwork Installation Method,” IOP Conference Series: Earth and Environmental Science, vol. 426, no. 1, 2020. Google Scholar | CrossRef | Publisher Link
[23] Hyun Changtaek et al., “Automated Optimization of Formwork Design through Spatial Analysis in Building Information Modeling,” Automation in Construction, vol. 95, pp. 193–205, 2018. Google Scholar | CrossRef | Publisher Link
[24] A Krawczy´nska-Piechna, “An Analysis of the Decisive Criteria in Formwork Selection Problem,” Archives of Civil Engineering, vol. 62, no. 1, pp. 185–96, 2016. Google Scholar | CrossRef | Publisher Link
[25] Doaa Sameer Abdullah, and Raed Salim Ahmed Al-Nuamman, "The Role of Roofing Systems in Reducing the Cost of Construction - A Comparative Study Between Prefabricated and On-Site Cast Ceilings," International Journal of Engineering Trends and Technology, vol. 71, no. 2, pp. 143-156, 2023. Google Scholar | CrossRef | Publisher Link
[26] Shemin T. John et al., “An IoT Device for Striking of Vertical Concrete Formwork,” Engineering, Construction and Architectural Management, vol. 29, no. 5, pp. 1991-2010, 2022. Google Scholar | CrossRef | Publisher Link
[27] Tarek Zayed, and Elsayed Mohamed, “A Case of Productivity Model for Automatic Climbing System,” Engineering, Construction and Architectural Management, vol. 21, no. 1, pp. 33–50, 2014. Google Scholar | CrossRef | Publisher Link
[28] Taylan Terzioglu, Harun Turkoglu, and Gul Polat, “Formwork Systems Selection Criteria for Building Construction Projects: A Critical Review of the Literature,” Canadian Journal of Civil Engineering, vol. 49, no. 4, 2021. Google Scholar | CrossRef | Publisher Link
[29] Debrah Kwame Donkor, and Shaibu Mahamud, "Comparative Assessment of Formwork Systems used in Construction Projects in the Tamale Metropolis of Northern Ghana," SSRG International Journal of Civil Engineering, vol. 9, no. 2, pp. 44-50, 2022. CrossRef | Publisher Link
[30] Zakaria Dakhli, and Zoubeir Lafhaj, “Experimental and Numerical Prototyping of a Complex Cement Column Formwork for Construction,” Architectural Engineering and Design Management, vol. 13, no. 2, pp. 147-165, 2017. Google Scholar | CrossRef | Publisher Link
[31] Sujay Raghavendra Naganna et al., “Insights into the Multifaceted Applications of Architectural Concrete: A State-of-The-Art Review,” Arabian Journal for Science and Engineering, vol. 46, no. 5, pp. 4213-4223, 2021. Google Scholar | CrossRef | Publisher Link
[32] Nitin L. Rane, and Geetha K. Jayaraj “Comparison of Multi-Influence Factor, Weight of Evidence and Frequency Ratio Techniques to Evaluate Groundwater Potential Zones of Basaltic Aquifer Systems,” Environment, Development and Sustainability, vol. 24, no. 2, pp. 2315-2344, 2022. Google Scholar | CrossRef | Publisher Link
[33] Nitin Rane, and Geetha K. Jayaraj, “Stratigraphic Modeling and Hydraulic Characterization of a Typical Basaltic Aquifer System in the Kadva River Basin, Nashik, India,” Modeling Earth Systems and Environment, vol. 7, pp. 293-306, 2021. Google Scholar | CrossRef | Publisher Link
[34] Nitin Rane, and Geetha K. Jayaraj, “Evaluation of Multiwell Pumping Aquifer Tests in Unconfined Aquifer System by Neuman (1975) Method with Numerical Modeling,” Groundwater Resources Development and Planning in the Semi-Arid Region, Cham: Springer, pp. 93-106, 2021. Google Scholar | CrossRef | Publisher Link
[35] Yvonne R. Stürz, Manfred Morari, and Roy S. Smith, “Two Methods for the Identification of Uncertain Parameters of an Architectural Cable Net Geometry,” 2016 IEEE Conference on Control Applications, IEEE, pp. 804-809, 2016. Google Scholar | CrossRef | Publisher Link
[36] Bruno Lot Tanko et al., “An Implementation Framework of Value Management in the Nigerian Construction Industry,” Built Environment Project and Asset Management, vol. 8, no. 3, pp. 305-319, 2018. Google Scholar | CrossRef | Publisher Link
[37] Peter Uchenna Okoye, Isaac Abiodun Odesola, and Kevin Chuks Okolie, “Optimising the Awareness of Benefits of Sustainable Construction Practices in Nigeria,” Baltic Journal of Real Estate Economics and Construction Management, vol. 9, no. 1, pp. 62-77, 2021. Google Scholar | CrossRef | Publisher Link
[38] Anthony Torres, “Using Large Peer-Teaching Groups to Learn Construction Management Software Packages,” International Journal of Construction Education and Research, pp. 1-17, 2022. Google Scholar | Publisher Link
[39] Saeed Rokooei, and Ali Karji, “Exploring Construction Students’ Perceptions of Smart Buildings,” EPiC Series in Built Environment, vol. 2, pp. 284-292, 2021. Google Scholar | Publisher Link
[40] Lisha Wu et al., “Effects of Boundary-Spanning Roles and Interface Management Practices on Inter-organizational Communication in Construction Projects: Perspective of the Owner,” International Symposium on Advancement of Construction Management and Real Estate, Springer, pp. 361-371, 2022. Google Scholar | CrossRef | Publisher Link
[41] Arti Sahu, and S. Shanmugapriya, "Overview of the Challenges in the Construction of Multistorey Reinforced Concrete Structure," International Journal of Engineering Trends and Technology, vol. 70, no. 7, pp. 212-219, 2022. CrossRef | Publisher Link
[42] I.B. Ologunagba, A.S. Daramola, and A.O. Aliu, "Feasibility of using Rice Husk Ash as Partial Replacement for Concrete," International Journal of Engineering Trends and Technology, vol. 30, no. 5, pp. 267-269, 2015. Google Scholar | CrossRef | Publisher Link
[43] Yoonseok Shin et al., “A Formwork Method Selection Model Based on Boosted Decision Trees in Tall Building Construction,” Automation in Construction, vol. 23, pp. 47–54, 2012. Google Scholar | CrossRef | Publisher Link
[44] Ashraf M. Elazouni, Amal E. Ali, and Refaat H. Abdel-Razek, “Estimating the Acceptability of New Formwork Systems Using Neural Networks,” Journal of Construction Engineering and Management, vol. 131, pp. 33–41, 2005. Google Scholar | CrossRef | Publisher Link