Downtime Analysis of Tube Filling and Carton Packing Machine at FMCG Company
Citation
Paragjyoti Baishya, Ajoy Krishna Dutta"Downtime Analysis of Tube Filling and Carton Packing Machine at FMCG Company", International Journal of Engineering Trends and Technology (IJETT), V28(9),438-446 October 2015. ISSN:2231-5381. www.ijettjournal.org. published by seventh sense research group
Abstract
Improvement of both the product quality and
productivity is mandatory for a company in order to
sustain in this competitive market. In the recent times,
manufacturing industries have to face a tough
competition from its rivals for its existence in the
market. This can be done only with the availability of
machines in the industry. One can also say that by
making the machines available for long time without
breakdown can improve both its quality and
productivity. Total Productive Maintenance aims to
increase the availability of machines by the reduction of
Downtime or Breakdown time of machines. The aim of
this study is to find out the major breakdown that
causes maximum production loss of the company using
Pareto Analysis. Also Cause and Effect Diagram is
conducted to explore the possible causes for the
breakdown. Some counter measures are suggested as
corrective action towards the end so that Downtime of
machine can be reduced.
References
[1] Ahmed,Tanvir;Acharjee, Raj Narayan; Rahhim, MD. Abdur;
Sikder, Noman; Akhter,Taslima; Khan,Mohd. Rifat; Rabbi,
MD.Fajle; Saha,Anup; “An Application of Pareto Analysis
and Cause-Effect Diagram for Minimizing Defects in
Sewing Section of a Garment Factory in Bangladesh”,
International Journal for Modern Engineering Research, Vol.
3, Issue 6, 2013, pp.3700-3715.
[2]Kiran, M; Mathew,Cijo; Kuriakose, Jacob;“Root Cause
Analysis for Reducing Breakdowns in a Manufacturing
industry”, International Journal for Emerging Technology
and Advanced Engineering, Vol. 3, Issue 1, 2013, pp.211-
216.
[3] Ahmed, Mohiuddin; Ahmad, Nafis; “An Application of Pareto
Analysis and Cause-and-Effect Diagram (CED) for
Minimizing Rejection of Raw Materials in Lamp Production
Process” Management Science and Engineering, Vol. 5, No.
3, 2011, pp.87-95.
[4] Ilie, Gheorghe; Ciocoiu, Carmen Nadia; “Application of
Fishbone Diagram to Determine the Risk of an Event with
Multiple Causes”, Management Research and Practice, Vol.
2, Issue 1, 2010, pp.1-20.
[5] Bose,TarunKanti; “Application of Fishbone Analysis for
Evaluating Supply Chain and Business Process-A Case Study
on the St. James Hospital”, International Journal of
Managing Value and Supply Chains, Vol. 3, No. 2, 2012,
pp.17-24.
[6] Gupta,Amit Kumar; Garg, R.K; “OEE Improvement by TPM
Implementation: A Case Study”, International Journal of IT,
engineering and Applied Sciences Research, Vol. 1, No. 1,
2012, pp.115-124.
[7] Joshi,Aniruddha; Kadam,Pritam;”An Application of Pareto
Analysis and Cause Effect Diagram for Minimization of
Defects in Manual Casting Process”, Proceedings of IRF
International Conference, 2014, pp.110-115.
[8]Chandna,Pankaj; Chandra,Arunesh;”Quality Tools to Produce
Crankshaft Forging Defects: An Industrial Case Study”,
Journal of Industrial and Systems Engineering, Vol. 3, No. 1,
2009, pp.27-37.
[9]Mahto,Dalgobind; Kumar,Anjani; “Application of Root Cause
Analysis in Improvement of Product Quality and
Productivity”, Journal of Industrial Engineering and
Management, Vol. 1, No. 2, 2008, pp.16-53.
Keywords
Downtime, Total Productive Maintenance,
Pareto Analysis, Cause and Effect Diagram.