“Enhancement of Productivity at Sai Nath Fastners Through Lean Tool’’: PDCA-Demmings Cycle

  IJETT-book-cover  International Journal of Engineering Trends and Technology (IJETT)          
  
© 2017 by IJETT Journal
Volume-48 Number-1
Year of Publication : 2017
Authors : Uzma Parveen, Prof. Suman Sharma
DOI :  10.14445/22315381/IJETT-V48P206

Citation 

Uzma Parveen, Prof. Suman Sharma "“Enhancement of Productivity at Sai Nath Fastners Through Lean Tool’’: PDCA-Demmings Cycle", International Journal of Engineering Trends and Technology (IJETT), V48(1),31-34 June 2017. ISSN:2231-5381. www.ijettjournal.org. published by seventh sense research group

Abstract
Lean Concept has a good reputation of uncovering waste in manufacturing, survey production and business process by identifying, calculating and removing non value adding steps. Over all Lean is an easy method of recovering a product’s production path from door to door and to various machining operations. In a process survey is done where all non value added actions are searched and identified in each step and between each step there is estimations of its wastage time and resources are identified. Manufacturers face challenges in efficiencies in their manufacturing operations.

 References

[1] Jerry Kilpatrick, “Lean Principles”, Utah Manufacturing Extension Partnership, 2003
[2] Stephen Corbett, “Beyond manufacturing: The evolution of lean production”, The McKinsey Quarterly, 2007
[3] Michael H. McGivern, Alex Stiber, “Lean ManufacturingTechniques”, Development Dimensions International
[4] Ulrich, K.T. and Eppinger, S.D., Product Design and Development. (McGraw HillNew York, 2001
[5] Freddy Balle, Michael Balle, “Lean Development”, Business Strategy Review, pp. 17-22, Autumn 2005
[6] John S. W. Fargher, “Lean Manufacturing And Remanufacturing Implementation Tools”,Missouri Enterprise, pp. 28-36, 2011
[7] Andersen, B., Business Process Improvement Toolbox. (ASQ Quality Press, Milwakuee, 2007).
[8] Reid, R.R. and Koljonen, E.L., The Deming Cycle Provides a Framework for Managing Environmentally Responsible Process Improvements. Quality Engineering, 1999, 12, pp199- 20

Keywords
Demming Cycle,VSM,PDCA.