Abstract
Software effort estimation is the measurement of work and resource required to develop a software system for a particular period. Cost can be determined using effort as cost is directly proportional to effort. Software cost estimation is one of the most difficult jobs in project planning especially in its early phase. In earlier proposed cost estimation models, cost estimation is done with more than 20 parameters at the early conceptual phase and if input is not defined using logical approach, the results of estimation are unpredictable. Using too many cost drivers or parameters make cost estimation process lengthy and complex. In our proposed study, we will highlight on the pros and cons of different cost estimation methods. Then we will look forward to work on making a simple system with minimum set of parameters that can be easily identified at an early stage while considering all possible aspects such as accuracy, simplicity etc.
References
[1] Boehm, Barry W., ?A Technical Book on Software Engineering Economics. in Prentice Hall, 1981.
[2] Boehm B., ?Software Engineering Economics in Englewood Cliffs, NJ, Prentice-? Hall, 1981
[3] Boehm B., Abts C., Brown W., Chulani S., Clark B., Horowitz E., Madachy R., Reifer D., Steece B., ?Software Cost Estimation with COCOMO II, in Prentice-? Hall, 2000
[4] Boehm, B., ?Safe and simple software cost analysis, in Software, IEEE, 17(5), pp. 14–17, 2000.
[5] Clark, B., Devnani-Chulani, S., and Boehm, B., ?Calibrating the COCOMO II Post-Architecture model, in Proc. Int’l Conf. Software Eng. (ICSE ’98), pp. 477–480, 1998.
[6] Boehm, B., 2001 COCOMO Website: http://sunset.usc.edu/research/COCOMOII/cocomo_main.ht ml
[7] Boehm, B., 2001 COCOMO Website: http://sunset.usc.edu/research/COCOMOII/cocomo81_pgm/h elp.html
[8] Boehm, B., ?COCOMO II Model Definition Manual in University of Southern California, 1999.
[9] Hareton Leung and Zhang Fan, ?Software Cost Estimation, in The Hong Kong Polytechnic University, 1999
[10] Dr. N. Balaji, N. Shivakumar & V. Vignaraj Ananth, ?Software Cost Estimation using Function Point with Non- Algorithmic Approach, in Global Journal of Computer Science and Technology Software & Data Engineering, Vol. 13 Issue 8, 2013. [11] Ian Sommerville, ?Software Cost Estimation, in Software Engineering Book, 6th edition, 2000
[12] Abedallah Zaid, Mohd Hasan Selamat, Abdual Azim Abd Ghani, Rodziah Atan and Tieng Wei Koh, ?Issues in Software Cost Estimation, in International Journal of Computer Science and Network Security, 350 VOL.8 No.11, 2008.
[13] Vahid Khatibi, Dayang N. A. Jawawi, ?Software Cost Estimation Methods: A Review, in Journal of Emerging Trends in Computing and Information Sciences, Vol 2, 2011.
[14] Ali Bou Nassif, Luiz Fernando Capretz and Danny Ho, ?Software Effort Estimation in the Early Stages of the Software Life Cycle Using a Cascade Correlation Neural Network Model, in International Conference on Software Engineering, Artificial Intelligence, Networking and Parallel/Distributed Computing, 2012
[15] Tharwon Arnuphaptrairong, ?Early Stage Software Effort Estimation Using Function Point Analysis: Empirical Evidence, in IMECS Vol-2, 2013
[16] Brad Clark, Wilson Rosa, Barry Boehm and Ray Madachy, ?Simple Empirical Software Effort Estimation Models, in 29th International Forum on COCOMO and Systems/Software Cost Modeling, 2014
[17] Wilson Rosa, Ray Madachy, Barry Boehm and Brad Clark, ?Simple Empirical Software Effort Estimation Model, in ESEM’14, ACM, 2014.
[18] I Wieczorek, M Ruhe, How valuable is company specific data Compared to multi-company data forsoftwareestimation??METRICS.02 , IEEE, pp 237- 246, 2002
Keywords
Project Estimation, Effort Estimation, Cost Models, KSLOC, SDLC, Early Phase Cost Estimation.